Site-Specific Assessment

Please fill in the form to request a site-specific assessment.

What information do I need to provide?
  • All available information regarding the jack-up, eg. technical drawings, previous SSA reports, designer’s manual etc.
  • All available information regarding the site, eg. metocean report, soil investigation report, planned operations.
  • A purchase order
How long does it take?

The SSA report will be delivered within 3 working days after all required information has been provided.